CE-01 Field guide / Capacity and economics
When to hire: check the capacity inputs first
A desk can have spare hours in the month and still lack the right engineer at the time a client needs help. Describe the constraint before translating a busy week into a headcount request.
For Owner, Service manager
On this page
Put matching labels on both sides
Name the role or team, period and included work. A fictional boundary: "Remote agreement support in September; separately staffed projects excluded from both availability and demand."
Available hours are the time left after the commitments excluded under that boundary. Workload is demand assigned to that remaining time. Count a commitment once. Either exclude project bookings and project demand from both sides, or include both. Subtracting the bookings and then adding their demand creates a false shortfall.
Trace availability to actual staffing, leave, training, site visits and management duties. Keep overtime separate from the planned schedule. Trace demand to support, escalation, documentation, vendor coordination and other duties in scope. Adam Hannemann's time-tracking discussion concerns that effort visibility.[1] A ticket count cannot substitute for hours.
A short calculation, then a separate coverage check
In a fictional month, 600 available hours minus 610 workload hours gives −10 hours of aggregate headroom. If a proposed improvement releases 11 recurring hours, the scenario becomes +1 hour. Eight setup hours leave −7 in the first period.
Those figures answer one question about total effort. They leave peak coverage, skills, absence resilience and client growth unresolved. Ask when commitments were missed, which capability was unavailable and whether the same constraint persisted across comparable periods. A project spike deserves a different plan from recurring specialist demand.
The MSP KB describes duties across MSP roles.[2] Write the proposed role around the missing duty. A general support hire might reduce routine work while leaving an owner-bound dispatch process unchanged.
Where to find the evidence
Use PSA time records and booking calendars, not only the dashboard's utilization tile. Autotask, ConnectWise PSA and HaloPSA are examples; verify your version's export fields and exclusions. Autotask documents separate ticket/task references, work dates, hours and nonbillable status.[3] Include non-invoiced work when it is inside the review scope, and check that permissions have not filtered it out.
RMM alerts can help find repeated faults to investigate. An alert count has no dependable conversion to technician hours; join the resulting work to service records and account for work done outside tickets.
Keep scenarios out of today's availability
Existing automation already affects current workload, so it receives zero new scenario credit. For a proposed change, confirm the work still exists in the baseline and another initiative has not claimed it. Deduct review, exceptions and maintenance from the saving, then charge setup once in the first period.
Missing workload is unknown, not zero. Better time capture can increase recorded hours without increasing demand. Record that measurement change before comparing months. A promising scenario still needs a test and a usable time window before it becomes coverage.
The working discipline
Automate before you hire
Standardize the team, period and work boundary before automating collection of time and calendar inputs. Check missing effort, double counting and usable time windows with a manager; aggregate spare hours cannot decide skill coverage or authorize a hire.
Review the sequence →Worksheet / Usable takeaway
Hiring-evidence note
- Boundary: [role / period / work / exclusions].
- Availability: [calendar sources / commitments counted once].
- Workload: [recorded / estimated / missing categories].
- Aggregate headroom: [value / evidence label / unresolved gaps].
- Constraint: [skill / time window / service consequence].
- Persistence: [comparable periods / spikes / planned growth].
- Improvement: [baseline still present / overlap / net effort / setup].
- Proposed role: [duties / constraint expected to change].
- Next check: [owner / evidence / review date].
Use the free capacity sample to inspect unknown and negative cases. Cost, cash and employment decisions need their own review by the responsible owner; the hours comparison supplies evidence, not a hiring approval.